FMS EdgeFMS Edge — home

Guide

What are nonstandard items in Foreign Military Sales?

Updated 26 October 2026Checked against the SAMM: 26 October 2026

A nonstandard item is one the Department of War does not manage, because the has left its inventory or was never bought for its own forces, so support relies on manual procedures that cost more and take longer. The Department of War will still take reasonable steps to support such items when satisfactory arrangements are made with the country and supply sources exist. Commercial buying services supply nonstandard parts, repairs and services to purchasers.

What are nonstandard items in Foreign Military Sales?

For purposes, a is one the Department of War does not manage, either because the it applies to has been retired or because it was never bought for Department of War components.

The use of aging weapon systems beyond their original life expectancies has placed unexpected demands on supply systems initially provisioned to support shorter life cycles. A combination of diminishing manufacturing support, failure of electronic components, fatigue and corrosion of non-electronic parts, and age, has created unanticipated demands for spares supporting older weapons systems. Exacerbating the problem, the original equipment manufacturer might not be capable of supplying spares, repair parts and engineering support for aging weapon systems. The original manufacturer might no longer exist.

Commercial Buying Services () involve the purchase of defense articles and services that cannot be effectively acquired through other means. The is authorized to use a for nonstandard items, and for standard items that are difficult to support, when Department of War (DoW) organic capability or contractual supportability is not available or timely [SAMM ].

The purchase of nonstandard items can have an impact on the follow-on support provided by the DoW. Nonstandard items, as they relate to , may be defined as any items or equipment not included in the DoW inventory or not purchased for regular use by the DoW. The DoW also considers as nonstandard those country-peculiar system configurations resulting from the installation of a nonstandard item on equipment or systems that make it dissimilar to like systems in the DoW inventory.

Nonstandard items are normally in channels for the following reasons:

  • The international partner may change an item’s design to improve the desired mission.
  • The U.S. may change the design for security reasons.
  • An item may become obsolete as a result of technological advancements and improvements.

Follow-on support problems are encountered because the DoW does not manage nonstandard items, so normally no or is assigned to them. Instead of a relatively standard requisition and distribution system, manual procedures are used to satisfy international partner demands. This not only proves more costly to the U.S. but also increases the replacement time and costs for the international partner.

The following special programs provide contractor support for nonstandard items:

  • The is managed by the U.S. Army. The program purchases nonstandard item components, repair parts and supplies of primarily land systems and communications equipment, and UH-1 helicopter spares.
  • The Parts and Repair Ordering System () is a contractor-operated program that purchases nonstandard item components, repair parts, and supplies and arranges for maintenance of nonstandard items on a repair-and-return basis. Although the program is managed by the U.S. Air Force, the Army and Navy also use the program for nonstandard spares, nonstandard maintenance, and nonstandard services.

The options open to the include and [SAMM ].

Finding sources for supply of nonstandard items, particularly spare parts for end items no longer in the DoW inventory, has been an ongoing challenge. System support buyouts and efforts to withhold items with requirements from disposal are providing only a partial answer to this problem. contracts, such as , are filling an important need in this area. In addition to nonstandard item support, processes are a source of last resort for defense articles and services that cannot be supplied by the standard DoW logistics system in a timely manner.

Another use of the term “nonstandard” applies when the international partner requests DoW support for an item that the international partner purchased commercially, in a configuration not supported by the DoW. In this situation, it may become necessary for the international partner to provide manufacturing design specifications from the prime vendor to the DoW in order to determine the level of supportability through the DoW. This configuration study can be funded through an .

International partners may receive spare parts and support equipment that have been manufactured in other countries. This occurs when the contracts with a U.S. company, who outsources or subcontracts work to a foreign company or foreign subsidiary. The U.S. company imports the items to the U.S., where they are accepted by the DoW, become part of the DoW inventory, and are used by U.S. forces. Despite the fact that the items are manufactured abroad, they are considered to be of U.S.-origin and are exported to the international partner using the same procedures as if they had been manufactured in the U.S.

The DoW will take reasonable steps to support systems that U.S. forces do not use, including items U.S. forces never adopted. Support for such items is provided when mutually satisfactory arrangements have been made with the country concerned and sources of supply are available. An effort is made to support nonstandard items, whether they were acquired commercially or through , when that effort serves U.S. interests [SAMM ].

A request for that is not standard in the Department of War inventory is reviewed by the , which coordinates with the 's Office of International Operations before data or a is developed [SAMM ]. Nonstandard also needs a Standard Advisory Letter and a unique review [SAMM ]. In exceptional cases a purchaser may ask for data on a nonstandard subsystem; its request should describe the subsystem's performance characteristics and justify the request, including why U.S. systems do not meet its requirements, and the must approve any proposed response [SAMM ]. Before a counts as complete, whether it calls for nonstandard or equipment must be determined [SAMM ].

References

SAMM

Related