FMS EdgeFMS Edge — home

Guide

What is a Non-Program of Record item in Foreign Military Sales?

Updated 5 November 2026Checked against the SAMM: 2 November 2026

A is a nonstandard capability or system that the Department of War has not formally adopted, fielded or funded. A partner may still request one through , and the request then carries extra steps: a disclaimer note on the price data and the offer, a record of the line's type, and rules on who pays for the added development work.

What is a Non-Program of Record item?

A is a nonstandard capability or system that the Department of War (DoW) has not formally adopted, fielded or funded [SAMM ]. The U.S. Government () regularly receives requests from purchasers for NPOR solutions that meet their own unique requirements [SAMM ].

Why does the U.S. Government consider NPOR requests?

An NPOR solution may support U.S. objectives, advance interoperability with U.S. forces, improve U.S. competitiveness, strengthen the U.S. defense , help allies and partners defend themselves, and reinforce ties with partners and allies [SAMM ].

How is an NPOR request handled?

Whether a request needs nonstandard or NPOR equipment is one of the points criterion 7 of Table C5.T4B lists, as appropriate, for a to be considered complete [SAMM ]. A partner may submit an for data on NPOR systems and subsystems. A response on an NPOR system or subsystem must be coordinated with the stakeholders concerned, in line with internal guidance. Where the lacks sufficient historical procurement data, it should coordinate with the contractor providing the NPOR system or subsystem before it gives a response. Each response on an NPOR system or subsystem must include the NPOR Disclaimer for line note [SAMM ].

The same requirement reaches the offer itself. A , or a response, that contains an NPOR solution must include the Appendix 6 note titled “ Disclaimer for Cases” [SAMM ]. A sale that triggers the congressional notification threshold of Section 36(b), , and involves NPOR articles is one of the listed kinds of sale that may warrant a Pre-Case Review [SAMM ].

An NPOR solution, or a component of one, that is not designated as needs no Operational Test and Evaluation Incomplete case note and no early risk communication. When an article that otherwise meets the Section C5.3.3 requirements under DoDI 5000.85 is built into an NPOR solution as a component, both the case note and the early risk communication apply [SAMM ].

How is an NPOR case line recorded?

In the Defense Management System (), must mark every case line item in development as either a or an NPOR, whether the document is a base case, an amendment or a modification. The rule covers both and Building Partner Capacity cases. For an NPOR line, case writers must also choose the line's NPOR type. need not bring existing up to the new standard, but must update affected lines when they process a new amendment or modification. The data captures will support efforts to identify, track and analyze the demand signal from industry and purchasers for NPOR articles and services, and DoW's overall activities involving them [SAMM ].

NPOR solutions are to be categorized by one of the following types [SAMM ]:

  • Type A, modified or former POR: a request to modify an existing POR with NPOR elements, or a request tied to a former POR
  • Type B, military unique: a commercial capability designed, modified or built specifically for military use that is not a current or former POR
  • Type C, commercial: a commercial product, as 2.101 defines it, that is not classified

Who pays for NPOR case development?

may fund NPOR activities before an as Table C9.T2A specifies, and may fund NPOR case development from their current-year Administrative Surcharge Account allocations. For case development, the preferred route for the to consider is funding by the partner, through an Analysis and Studies case or a Technical Assistance case, in place of surcharge account funds. Once the NPOR is implemented, the should seek reimbursement to the surcharge account of documented NPOR-unique expenses, to the maximum extent feasible. If no is developed or implemented, the pre- funds first used will remain the proper funding source [SAMM ].

Any administrative funds spent on NPOR-unique case development expenses must be paid back to the surcharge account when the NPOR case is implemented, and the amounts paid back must be included in the case's [SAMM ]. If more funding is still needed to develop the or the , the may ask for an out-of-cycle surcharge account allocation through the unfunded requirement process in Chapter 14 of the . The must then detail every activity that needs funding to develop and offer the , and show that it has pursued all other funding avenues. Every NPOR resourcing request sent to the must also meet the NPOR resourcing criteria set for such requests [SAMM ].

References

SAMM

Related