FMS EdgeFMS Edge — home

Guide

What are the steps of FMS case development?

Updated 26 October 2026Checked against the SAMM: 26 October 2026

The builds the in the Defense Management System, clears releasability and waivers, and posts the Approval milestone. The 's Case Writing and Development Division then writes and staffs the document, reviews it, and the countersigns it so that it can be offered.

CASE DEVELOPMENT: WHO HOLDS THE LOA, STATUS D TO O fmsedge.com How long does it take to get a Foreign Military Sales Letter of Offer and Acceptance? Case development standard (SAMM Table C5.T9), met by 85% of documents: Category A 30 days · Category B 90 days · Category C 130 days The clock starts at LOR Actionable (Categories A, B and C) and stops at Offer. What are the steps of FMS case development?DDevelopmentDSTATUS W Write WSTATUS R Review RSTATUS P Proposed PSTATUS LOA Offered in Foreign Military SalesOOfferedOSTATUS · OFFERED HELD BY Implementing Agency (IA) Builds the LOA data (LOAD) in DSAMS: case lines, pricing and availability, releasability, notification data. Waivers and special approvals are finished first. After its quality review, the IA posts MILAP. SAMM C5.6.9.1 · C5.6.11.1 HELD BY DSCA (IOPS/GEX/CWD) Case Writing and Development Assembles the LOAD and does final preparation of the document, then a final quality assurance review before it moves to Review. SAMM C5.6.11.6 HELD BY DSCA HQ and the IA review in the Case Tracking System CWD uploads the final version for review. The required DSCA HQ offices approve in CTS; the IA approves by posting MILSGN. Then it is Proposed. SAMM C5.6.11.7 Foreign Military Sales Arms Transfer Office (State Department)HELD BYState (PM/RSAT)when State approval is requiredGoes on the daily State FMS List for State review and approval: required for LOAs and for Amendments that add or increase scope.SAMM C5.6.11.8 · C5.6.11.8.1 HELD BY Implementing Agency (IA) DSCA countersigns (DCSGN) on State's approval; DSAMS then sets Offer status. The IA signs and offers It signs the LOA and sends it to the purchaser, through the SCO as appropriate. SAMM C5.6.11 · C5.6.11.9 · C5.6.2 returned for corrections: back to Development for the IA (SAMM C5.6.11.6.1 · C5.6.11.7.3) A Modification goes from countersignature to Implemented status, not Offered (SAMM C5.6.11). Category D (Building Partner Capacity) documents are timed to BPC Wait, not Offer (Table C5.T9). Positions show sequence, not elapsed time. Status codes are the DSAMS milestones of SAMM Table C5.T14. FMS Edge status in DSAMS · Offered: the clock stops · only when a document is returned fmsedge.com · Current as of 26 October 2026 · SAMM C5.6.2 · C5.6.9 · C5.6.11 · C5.T9 · C5.T14 · C5.T15

While a Letter of Offer and Acceptance is being prepared it moves through five statuses in DSAMS, from Development to Offered. The case development standard, counted from LOR Actionable to Offer, is 85% of documents within 30 days for Category A, 90 days for Category B and 130 days for Category C.

Who holds the Letter of Offer and Acceptance: status D to O · Current as of 26 October 2026 · SAMM C5.6.2 · C5.6.9 · C5.6.11 · C5.T9 · C5.T14 · C5.T15 · Download PNG

What are the steps of FMS case development?

The builds the offer's data in the Defense Management System; the then writes and staffs the document, approves it where required, and the countersigns it so it can be offered [SAMM , , , ].

To initiate case development, the country director tasks preparation of the using the Defense Management System (). Every case has an assigned case manager, and it is normally the case manager who has primary responsibility for the overall content.

For major system sales, the case manager coordinates with program managers and item managers to determine the line items to be included on the case to meet requirements identified in the international partner’s . Cost and availability estimates are developed for all articles and services included in each line. These estimates may be based on current Department of War (DoW) inventories or on information from U.S. defense contractors.

personnel also prepare notes that pertain specifically to the lines and being developed. If the international partner has requested any waivers, the will staff the waiver request(s) and ensure it is appropriately reflected in the case [SAMM ].

During case development, the will construct a separate line item for each generic category of materiel or services to be provided. The will assign the appropriate materiel number to each line item. The complete materiel , which is substantial, resides in . Elements of the data include generic codes, numbers, and descriptions.

In case development status, the is responsible for developing the and for its initial quality assurance [SAMM ]. The loads the into and builds the basic structure of the there. That structure includes pricing and availability, the individual case lines, releasability coordination, any data needed for congressional notification under Section 36(b), [], manpower worksheets and other supporting documents. All waivers, releasability coordination and any special approvals should be finished before the goes to the (/GEX/CWD) for final processing. The should also carry out a quality review of the before submitting it [SAMM ].

In addition to the , 's Case Writing and Development Division ( (/GEX/CWD)) plays a role in case development. Once the has finished the process for a basic , amendment or modification, and its own quality review of the package, it will post the approval () milestone in . Posting the milestone moves the document from Development to Write status and opens a case record on the case-tracking dashboard, where the uploads the offline documentation for transmission to (/GEX/CWD) [SAMM ]. The package the submits to (/GEX/CWD) with the draft must include the , a Manpower and Travel Data Sheet when the document includes case-funded manpower, the documentation for any waivers, and the cover memorandum [SAMM , , , ]. (/GEX/CWD) then completes the writing process by accomplishing a quality review for policy compliance and by adding the and the standard notes [SAMM , ]. After finalizing the document, (/GEX/CWD) staffs it for the , headquarters , and legal reviews as appropriate [SAMM , ]. When this coordination process is complete, (/GEX/CWD) adds the to the daily List for 's review and approval. Once approves, (/GEX/CWD) electronically countersigns the , and the is offered to the international partner [SAMM , ].

The single-letter codes that mark each step of case development stand for the case statuses records, Development, Write, Review, Proposed and Offered, each with its status milestone (DSTATUS, WSTATUS, RSTATUS, PSTATUS and OSTATUS) [SAMM ].

The step works the same way for a Basic , an Amendment or a Modification. Once the milestone is posted, the case record and the off-line documentation the submitted pass to (/GEX/CWD) in the for processing. (/GEX/CWD) uses various reports to see when case documents have reached Write status [SAMM ].

approval is required for an and for any later Amendment that adds or increases scope [SAMM ]. Each day, (/GEX/CWD) sends the List Report, which describes the defense articles and services that documents transfer. produces the report, and it carries the " Description" that the enters in the Case Detail Window. The is responsible for that description and follows Table C5.T17 in writing it [SAMM ].

The Description names, clearly and concisely, the major defense articles or services being sold or transferred, with their quantities, and says whether follow-on support or spares are also being provided. Sensitive munitions, such as white phosphorus or depleted uranium, must also be highlighted in it [SAMM ]. For an Amendment to a case, the description lists the additional end items. Quantities should be included only where they increase or decrease, with a brief explanation of the change. An Amendment that realigns funds between lines, or adjusts delivery schedules or periods of performance, should say in a short statement what the document is meant to do. For a follow-on support document, whether a Basic , an Amendment or a Modification, the description lists the being supported and, where several platforms are supported, describes the items delivered earlier [SAMM ].

References

SAMM

Public authorities

  • AECA §36(b): Arms Export Control Act of 1976, as amended, §36(b) (22 U.S.C. §2776(b))

Related