What is a Foreign Military Sales payment schedule?
The on a forecasts the purchaser's deposits and when they fall due, starting with an and followed by estimated quarterly payments. The prepares it from the 's line-level data. It is reviewed at least once a year and revised when delivery, scope, price or contract dates change, and a purchaser that wants it reviewed should ask the .
One billing quarter and the first payment on one time axis. For the period ended December 31st the statement goes out on or about January 15th and payment is due at DFAS-IN by March 15th; the worked row below shows the Initial Deposit covering the case until its earliest scheduled payment. The example case is BN-Q-SEH, from SAMM Figure C5.F8. Bandaria is the manual's fictional training country; the figures are the SAMM's example, not a real case.
What is a Foreign Military Sales payment schedule?
payment schedules provide forecasted financial requirements for a and project the timing and/or amounts of international partner deposits needed to meet the requirements. Payment schedules for documents are prepared by the Case Writing and Development Division (CWD) during the case development process based upon inputs (i.e., source of supply, lead time, delivery schedules, period of performance, progress payment schedules) provided by the [SAMM ]. Implementing Department of War (DoW) components are expected to continually monitor case-level cash advances and validate the accuracy of payment schedules. The estimated normally includes specific dates when each payment is due and consists of two financial categories:
1. An
2. Estimated quarterly payments
The terms of sale and the estimated payment schedule on the sample LOA in SAMM Figure C5.F8. Bandaria is the manual's fictional training country; the figures are the SAMM's example, not a real case. The second page sets out the payments the purchaser should plan for, quarter by quarter.
Payment schedules are developed only for cases where the country or international organization is eligible for (DU), unless the case's Term of Sale is "." A country or international organization that is not eligible for DU is not authorized a and must buy on the "" Term of Sale [SAMM ].
cases financed with Credit (Non-Repayable), Merger or both require no . The may send requests for policy exceptions to the Regional Division of 's Financial Policy and Regional Execution Directorate, in its Office of Business Operations [SAMM ].
Payment schedules, to include initial deposits, are built upon assumptions and Defense Management System () inputs such as source of supply, lead time, delivery schedules, period of performance, progress payment schedules, etc. Payment schedules are built, using , at the line level (or sub-line or delivery-set level), and rolled-up, to a case-level schedule [SAMM ]. Payment schedules are prepared using pricing estimates and estimated dates for the following: acceptance, case implementation, requisition initiation, contract awards, contractor payments, physical deliveries, and incurrence of personnel costs [SAMM ].
Other information required to prepare the include contractor termination schedules (used in the ), lead times and/or availability, periods of performance, and disbursement histories for like-item cases or lines already implemented [SAMM , ]. Each deposit amount covers all costs estimated to be incurred on the international partner’s behalf during the payment period, plus a reserve to cover (for sales from procurement). Costs may include such items as anticipated deliveries of services and stock items, and on contracts [SAMM ]. This information is needed at the line level and must be provided by the to (/GEX/CWD) for preparation [SAMM ].
Typically, the projects quarterly payments due by the 15th day of March, June, September, and December per Table C9.T16. Exceptions to these dates must be approved by the Office of Business Operations () [SAMM ].
The are responsible for keeping payment schedules accurate, through annual reviews and a review each time the case is modified or amended [SAMM ]. (/GEX/CWD) prepares the on the in , from the line-level data the provides [SAMM ]. It also conducts a final quality assurance review of each document before the package moves to Review status [SAMM ].
updates are necessary to reflect revisions to delivery schedules, scope changes, pricing updates, actual dates, contractor payment milestone revisions, etc. To determine whether an update is needed, reviews occur at least annually as part of the case review and reconciliation process. Payment schedules must be evaluated for possible changes when a modification or amendment is processed [SAMM , ].
When an amendment or modification changes a case, the updates the through that amendment or modification as needed [SAMM ]. Amendments use the term “Due with Amendment Acceptance” vice [SAMM ].
A purchaser that wants a specific case's reviewed or revised should send its request to the appropriate [SAMM ].
The initial deposit and quarterly payments
The is a financial requirement collected from the international partner at the time they accept the case. The relates to the costs anticipated to be incurred from case acceptance (assumed for calculation estimation purposes to be the ) through the period that the U.S. Government () will be delivering/performing materials and/or services per the applicable case [SAMM ]. Table C9.T16 defines the time frame based on offer expiration/acceptance dates of . Determining the period and the earliest quarterly payment date is based on the ’s /expected case [SAMM ].
Any quarterly payments thereafter (i.e., subsequent to the ) should be sufficient to cover all costs and contingencies anticipated to be incurred by the on the international partner’s behalf during the quarter immediately following the payment due date [SAMM ].
The list below describes types of costs that can make up the and any subsequent estimated quarterly payments:
- Anticipated materiel deliveries/services from procurement
- Anticipated materiel deliveries/services from stock
- to defense contractors
- Authorized surcharges, including the administrative surcharge: any Small Case Management Line value, plus 35 percent of the surcharge where it exceeds $30,000, or the whole surcharge where it is $30,000 or less [SAMM ]
- reserve
- Contractor holdback
Some of the terms used above deserve special comment:
- are made to contractors or DoW industrial fund activities as work progresses under a contract or work order, based on costs incurred or percentage of completion, or a particular stage of completion, accomplished prior to actual delivery and acceptance of contract items or services.
- Contractor holdback is the amount earned by contractors or suppliers during the period but held back by the to ensure future performance of the contractor.
Try the tools: Payment schedule estimatorOffer expiration and first payment
References
SAMM
- SAMM C9.9.1.3: Information Needed to Prepare the Payment Schedule.
- SAMM C9.9.1.2: Line Level.
- SAMM C9.9.1.5.3: Termination Liability.
- SAMM C9.9.1.5.2: Payment Schedule Curves.
- SAMM C9.9.1.5: Payment Distribution.
- SAMM C9.9.1.4: Timing of Payments.
- SAMM C9.10.2.5.3: Implementing Agencies.
- SAMM C5.6.11.6: Write Status.
- SAMM C9.T16: Payment Schedule Dates
- SAMM C9.9.3: Payment Schedule Revisions.
- SAMM C9.9.1.5.1: Initial Deposit.
- SAMM C9.T17: Initial Deposit Requirements
- SAMM C9.9.1.1: Payment Schedule Requirement.
- SAMM C9.9.3.5: Purchaser Requests for Payment Schedule Review.
Facts referenced
- Share of the total FMS Administrative Surcharge collected in the initial deposit (delivery more than 90 days after acceptance): 35 percent (as of 11 September 2026; SAMM C9.T17)
- FMS Administrative Surcharge value at or below which the whole surcharge is collected in the initial deposit: $30,000 (as of 11 September 2026; SAMM C9.T17)
Related
Payment Schedule
List of dollar amounts and when they are due from the foreign customer. The payment schedule is included in the Letter of Offer and Acceptance (LOA) presented to the customer. After acceptance of the LOA, the payment schedule generally serves as the basis for billing to the customer. Changes in the estimated costs of an Foreign Military Sales case may require changes in the accompanying payment schedule.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Letter of Offer and Acceptance (LOA)
The legal instrument that lists the defense articles and services, including training, that the U.S. Government transfers to a foreign country or international organization, with their estimated costs and the terms and conditions. The benefitting partner does not sign a Building Partner Capacity (BPC) LOA.
The Letter of Offer and Acceptance (LOA) is the instrument the U.S. Government uses to sell under the Arms Export Control Act (AECA); signed LOAs and their later Amendments and Modifications are also called Foreign Military Sales (FMS) cases [SAMM C5.6.1].
FMS Edge glossary, as of 10 October 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Initial Deposit
The payment a Foreign Military Sales (FMS) purchaser sends when it accepts a Letter of Offer and Acceptance (LOA), as full or partial payment for the articles, services or training it has agreed to buy.
Each LOA includes an initial deposit that covers the nonrecurring cost payment and the outlays or deliveries expected before the purchaser's first quarterly payment arrives [SAMM C9.9.1.5.1].
FMS Edge glossary, as of 10 October 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Defense Security Cooperation Agency (DSCA)
The Department of War agency that directs, administers and provides guidance to the Department's components and its representatives at U.S. missions for the execution of the security cooperation programs for which it is responsible [SAMM C1.3.2.2]. The agency also provides financial and technical assistance, arranges the transfer of defense materiel, training and services to international partners, and promotes military-to-military contacts.
FMS Edge glossary, as of 10 October 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Implementing Agency (IA)
The military department or defense agency responsible for the execution of military assistance programs. With respect to FMS, the military department or defense agency assigned responsibility by the Defense Security Cooperation Agency to prepare an LOA and to implement an FMS case. The implementing agency is responsible for the overall management of the actions that will result in delivery of the materials or services set forth in the LOA that was accepted by a foreign country or international organization.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Foreign Military Sales (FMS) Case
A Letter of Offer and Acceptance (LOA) that the purchaser has accepted, together with every Amendment and Modification later made to it: the agreement under which the U.S. Government transfers defense articles and services in the Foreign Military Sales (FMS) program.
FMS Edge glossary, as of 10 October 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
LOA: Letter of Offer and Acceptance
SAMM Acronyms, as of 12 September 2026
Dependable Undertaking (FMS)
An excepted term and condition within the Foreign Military Sales case (or Letter of Offer and Acceptance). A firm commitment by a foreign government or international organization to pay the full amount of a contract for new production or for the performance of defense services which will assure the U.S. against any loss on such contract and to make funds available in such amounts and at such times as may be required by the contract, or for any damages and costs that may accrue from the cancellation of such a contract, provided that in the judgment of the DoD there is sufficient likelihood that the foreign government or international organization will have the economic resources to fulfill the commitment.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Cash with Acceptance (FMS)
A term of sale in which U.S. dollar currency, check, or other negotiable instrument is submitted by the customer concurrent with acceptance of an Foreign Military Sales sales offer for the full amount shown as the estimated total cost on the Letter of Offer and Acceptance.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
FMS: Foreign Military Sale
SAMM Acronyms, as of 12 September 2026
Military Assistance Program (MAP)
That portion of the United States Security Assistance program authorized by the Foreign Assistance Act of 1961, as amended, which once provided defense articles and services to recipients on a nonreimbursable (grant) basis. Funding for MAP was consolidated under the Foreign Military Financing program beginning in Fiscal Year 1990.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
DSCA: Defense Security Cooperation Agency
SAMM Acronyms, as of 12 September 2026
Glossary entry →Defense Security Cooperation Agency (DSCA) →
Security Assistance (SA)
A group of programs authorized by federal statutes by which the United States provides defense articles, military training, and other defense-related services by grant, lease, loan, credit, or cash sales in furtherance of national policies and objectives, and those that are funded and authorized through the Department of State to be administered by Department of Defense/Defense Security Cooperation Agency, which are considered part of security cooperation.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
DSAMS: Defense Security Assistance Management System
SAMM Acronyms, as of 12 September 2026
Glossary entry →Defense Security Assistance Management Systems (DSAMS) →
Termination Liability Worksheet (TLW)
A worksheet prepared through Defense Security Assistance Management System that shows the amount of Termination Liability included in quarterly payments for each Foreign Military Sales case.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Termination Liability (TL) (Foreign Military Sales)
The potential cost for which the U.S. Government would be liable if a particular Foreign Military Sales case that includes procurement contracts is terminated prior to completion.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Progress Payments
Payments made to a prime contractor during the life of a fixed-price type contract on the basis of a percentage of incurred total costs or total direct labor and material costs.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
SAMM: Security Assistance Management Manual
SAMM Acronyms, as of 12 September 2026
Glossary entry →Security Assistance Management Manual (SAMM) →
Contract Award
This occurs when a contracting officer has signed and distributed a contract to a contractor.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
Offer Expiration Date (OED) (Letter of Offer and Acceptance (LOA))
The date on an offered LOA that indicates the last date on which the purchaser may accept the offer. The OED is normally 85 days from Military Department Approval in the Defense Security Assistance Management System, except for countries that have been approved for a longer OED.
SAMM Glossary, as of 12 September 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
OED: Offer Expiration Date
SAMM Acronyms, as of 12 September 2026
Implementation Date (Foreign Military Sales (FMS))
The date on which a Foreign Military Sales (FMS) case is implemented: the case becomes the agreed instrument between the U.S. Government and the purchaser, and the implementing agency begins or directs the supply and service actions that execute it.
The Implementing Agency (IA) takes action to implement a case once the purchaser has signed it and provided any required initial deposit [SAMM C6.1.1].
FMS Edge glossary, as of 10 October 2026
Glossary entry →Open the manual’s entry → (opens in new tab)
SAMM C9.9.1.3: Information Needed to Prepare the Payment Schedule.
“The DSCA (IOPS/GEX/CWD) will use DSAMS to generate the payment schedule on the LOA. Payment schedules are prepared using pricing estimates and estimated dates for when purchasers will accept the LOA, the LOA will be implemented, requisitions will be initiated, contracts will be awarded, payments will be made to contractors, deliveries will occur, and personnel costs will be incurred. The …”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.1.1: Payment Schedule Requirement.
“Payment Schedules are only developed for cases if the country or international organizations is eligible for Dependable Undertaking (DU), unless the Term of Sale is "Cash With Acceptance." Countries and international organizations ineligible for DU are not authorized payment schedules and must use the "Cash With Acceptance" Term of Sale. No payment schedule is required for FMS cases financed with …”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.1.2: Line Level.
“Payment schedules are built, using the Defense Security Assistance Management System (DSAMS), at the line level (or sub-line or delivery set level) and rolled-up to a case-level schedule.”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.1.5.3: Termination Liability.
“TL is the potential cost for which the USG would be liable if a particular FMS case is terminated prior to completion. It applies to any FMS case that has procurement contracts. Contractor termination schedules are used to calculate the TL that would apply for a specific FMS case. If these schedules are not available, the TL component of the …”
Security Assistance Management Manual, as of 5 October 2026
SAMM C9.9.1.5.2: Payment Schedule Curves.
“Payment schedule curves (most of which are in DSAMS) profile the expenditure patterns for types of cases and/or weapon systems. They are used to estimate how payments for each line should be distributed in the payment schedule. The IA may recommend adding new curves. The IA validates the need for a new curve and verifies how it should be constructed. …”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.1.5: Payment Distribution.
“Each deposit amount covers all costs to be incurred on the purchaser’s behalf during the next quarter, plus a reserve to cover Termination Liability (TL) (for sales from procurement). Costs may include such items as anticipated deliveries of services and stock items, and progress payments on contracts.”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.1.4: Timing of Payments.
“Typically, the payment schedule projects quarterly payments due by the 15th day of March, June, September, and December. Exceptions to these dates must be approved by the DSCA (Office of Business Operations (OBO)). Table C9.T16. shows how payment schedule dates should be determined. Table C9.T16. Payment Schedule Dates Offer Expiration/Acceptance Dates of Letters of Offer and Acceptance Earliest Payment Date …”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.10.2.5.3: Implementing Agencies.
“Irrespective of the FMS partner's billing method, IAs are responsible to ensure LOA payment schedules are accurate by performing annual reviews as required by the Table C9.T2A., and by reviewing and updating the payment schedules each time the case is Modified or Amended”
Security Assistance Management Manual, as of 11 September 2026
SAMM C5.6.11.6: Write Status.
“In Write status, the DSCA (IOPS/GEX/CWD) will assemble the LOAD provided by the IA and conduct final preparation of Basic LOAs, Amendments or Modifications. When completed, DSCA (IOPS/GEX/CWD) will conduct a final quality assurance review on the submitted LOA document before moving the package to Review status in DSAMS. DSAMS feeds will update the CTS application accordingly.”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.3: Payment Schedule Revisions.
“Payment schedule updates are necessary to reflect revisions to delivery schedules, scope changes, pricing updates, actual contract award dates, contractor payment milestone revisions, etc. IAs will review payment schedules during the annual case review process to determine if any updates are required. Additionally, IAs will update the payment schedules on LOAs that require Congressional Notification when the primary contract for …”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.1.5.1: Initial Deposit.
“Each LOA includes an Initial Deposit to cover the Nonrecurring Costs (NCs) payment and outlays and/or deliveries anticipated until the first quarterly payment is received. The Term of Sale, type of case, projected date of delivery or performance of services, anticipated date of LOA acceptance, and source of supply impact the Initial Deposit. The purchaser forwards the Initial Deposit to …”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.9.3.5: Purchaser Requests for Payment Schedule Review.
“Purchasers who wish a review or revision of a specific case payment schedule should forward a request to the appropriate IA.”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.T16: Payment Schedule Dates
“Table C9.T16. Payment Schedule Dates Offer Expiration/Acceptance Dates of Letters of Offer and Acceptance Earliest Payment Date on the Payment Schedule For Period Covering 11 Sep -- 10 Dec 15 Mar Apr-Jun 11 Dec -- 10 Mar 15 Jun Jul-Sep 11 Mar -- 10 Jun 15 Sep Oct-Dec 11 Jun -- 10 Sep 15 Dec Jan-Mar”
Security Assistance Management Manual, as of 11 September 2026
SAMM C9.T17: Initial Deposit Requirements
“Table C9.T17. Initial Deposit Requirements Condition Initial Deposit Amount Delivery of the defense article or service is within 90 days of LOA acceptance. The Term of Sale is “Cash With Acceptance.” Full case value Total performance is anticipated to be completed before DFAS-IN can bill and collect additional payments. The Term of Sale is “Cash With Acceptance.” Full case value …”
Security Assistance Management Manual, as of 11 September 2026